TB Reverb
source

TB Reverb

(3)
Price
9,99 €
Category
Music Entertainment
Last update
Mar 09, 2026
Publisher
ToneBoosters Contact publisher
View in store
Loading...

Ratings & Reviews performance

Ratings & Reviews performance provides an overview of what users think of your app. Here are the key metrics to help you identify how your app is rated by users and how successful is your review management strategy.

Number of reviews,
total
3
Avg rating,
total
⭐3.7
Loading...

Description

2145 chars

ToneBoosters Reverb is a studio-quality, professional reverberation AUv3 plug-in with an unrivalled workflow, unlimited creative use and a gorgeous, functional user interface. With its close to a hundred adjustable parameters, the integrated LFO for parameter modulation, integrated compression and gating, and its shimmer reverb module it is by far the most flexible and configurable reverb on iOS. The ToneBoosters Reverb app captures the microphone input and processes the signals in real time. To use it as a plug-in, use an AUv3-compatible host app such as Steinberg Cubasis, Apple Garageband, Audio Evolution Mobile Studio, Auria, AUM, or others. ToneBoosters Reverb will appear in the list of Audio Unit extensions for effect plug-ins. Key features: - Studio-grade reverberation including early reflections - The same professional sound as the acclaimed desktop version - Full control over room size, width, density, depth, mass - Integrated spectrum analyser showing direct and reverb simultaneously - Integrated equalizer to shape the reverberation character - Ability to modify reverberation time across frequency - Compression, ducking and gating for dynamic reverberation effects - Flexible, beat-synced LFO that can modulate almost everything! - Dual pitch-shift shimmer module for out-of-this-world reverberation - Reverb freeze option - Random parameter option to change the core reverb sound on the spot - Eco mode for lower CPU load on complex projects - Program manager with shared programs between stand-alone, IAA and AUv3 instances - Undo/redo, and A/B comparison - Color themes for the user interface - Max screen support in Garageband - Optimised for iPad and compatible with iPhone and iPod Touch Compatibility Please note that given the large flexibility and number of parameters that can be modified with this reverb, the use of an Apple pencil or stylus is highly recommended for smaller devices such as iPhone and iPod touch. What you should know: - Licenses acquired for this platform are not compatible with other platforms. - Audio Unit (AUv3) extensions require an iPad mini 2, iPad 4 or later models.

Screenshots

https://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/ae/de/66/aede668c-d594-10cd-2ae6-079ef2cc487a/71db1b01-8bfb-451d-9d12-2f7de44eec67_iPadPro12.9.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/ff/dc/7a/ffdc7a4c-3b0d-7756-913b-1d06f8b6ba86/7f1400f4-696a-43e4-9484-eb619fd39860_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_17.54.35.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/e0/32/7f/e0327fdc-c0d8-589d-f395-6748eb8c49b1/40f6e693-33f4-4a46-94bc-4d58915f3757_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_17.55.04.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/e7/df/90/e7df903e-680c-b827-c7d4-12f567526bd1/db6a9479-d74b-40b5-9eea-abf03dc3ad2c_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_17.55.13.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/c2/3a/cf/c23acfe1-be98-9ca2-8d43-5f3aca2e5f92/9d802937-7474-4975-91ac-f1ca98fcca63_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_17.54.47.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/1a/1e/09/1a1e09f2-981a-8ca4-98eb-e507390cf413/173503b1-bea8-4fda-a6ea-b651b82674cb_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_17.55.26.png/2732x2048.png
Loading...
Loading...

Find growth insights on our blog

React to user feedback and market trends faster