TB Compressor
source

TB Compressor

(24)
Price
$8.99
Category
Music Entertainment
Last update
Mar 09, 2026
Publisher
ToneBoosters Contact publisher
View in store
Loading...

Ratings & Reviews performance

Ratings & Reviews performance provides an overview of what users think of your app. Here are the key metrics to help you identify how your app is rated by users and how successful is your review management strategy.

Number of reviews,
total
24
Avg rating,
total
⭐4.8
Loading...

Description

3158 chars

Say Hi! to your new favourite iOS compressor AUv3 plugin! ToneBoosters Compressor is an AUv3 plugin for professional, mastering-grade compression and dynamics processing. This flexible plug-in has all the features you will ever need, such as: - Soft knee compression - Parallel compression - Upward and downward compression - External side-chain input (if supported by the host) - Band-limited compression - Spatially selective compression This compressor is suitable for every compression task and beyond: - Track compression - Bus and master bus compression - De-essing and de-harshing using the band-limited compression feature The user interface shows compression in action, with a real-time and interactive display of levels, gains and curves. Assisted sliders provide guidance to accurately adjust threshold, makeup and range parameters. Want to hear what signal elements are affected by compression? Hit the audition button and listen to everything that is changed by the compressor in isolation. The side-chain editor allows you to adjust the frequency response of the side chain, and has an integrated spectrum analyzer. You can select which channels the side chain listens to, including selection of mid or side channels. Obviously we have provided an audition button for the side chain as well! Imagine you could just compress the mid or side channel, and apply compression to a specific frequency range only. Dynamically make space for elements without having to compress the full mix; de-ess those sibilant vocals in the mid channel; soothe those harsh frequencies; the possibilities are endless. This is all possible with the compression zone feature. The ToneBoosters Compressor app captures the microphone (or external sound card) input and processes the signals in real time. To use it as a plug-in, use an AUv3-compatible host app such as Steinberg Cubasis, Apple Garageband, Audio Evolution Mobile Studio, Auria, AUM, or others. ToneBoosters Compressor will appear in the list of Audio Unit extensions for effect plug-ins. Key features: - The same professional sound as the acclaimed desktop version - Ultra-low harmonic distortion, even with very short attack and release times (THD less than -100dB at 1kHz, depending on the selected compression mode) - Full-fledged side-chain equalizer - Audition function for compressor and side chain - Integrated spectrum analyzer for output and side chain - Variable release curve shape and release time - Upward and downward compression - Signal-adaptive release - Auto make up - Range parameter to limit the amount of compression - Dry/wet (amount) control for parallel compression - Zero latency (for live use) or lookahead mode (for studio use) - Interactive user interface with assisted sliders, curve and gain visualization - Undo/redo, and A/B comparison - Color themes for the user interface - Max screen support in Garageband - Optimised for iPad and compatible with iPhone and iPod Touch What you should know: - Licenses acquired for this platform are not compatible with other platforms. - Audio Unit (AUv3) extensions require an iPad mini 2, iPad 4 or later models.

Screenshots

https://is1-ssl.mzstatic.com/image/thumb/PurpleSource115/v4/36/f4/46/36f44654-0adb-b96f-c794-d7f1a5e0954f/c8576167-f934-4ff7-9a67-93af4599e646_iPadPro12.9.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource115/v4/ed/45/3d/ed453da2-29c8-28c4-3604-5c9334a18372/4e3e92b8-6a66-4c94-8167-7af63e4f07b2_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_08.43.06.png/2732x2048.pnghttps://is1-ssl.mzstatic.com/image/thumb/PurpleSource125/v4/f6/bb/8a/f6bb8aa2-562d-18e1-2a0b-9237824d8a37/bba39a95-3789-4032-b8b2-81195cf66047_Simulator_Screen_Shot_-_iPad_Pro__U002812.9-inch_U0029__U00285th_generation_U0029_-_2021-07-15_at_08.43.18.png/2732x2048.png
Loading...
Loading...

Find growth insights on our blog

React to user feedback and market trends faster